Mobility
it can be moved and reused.
Rapid construction
short manufacturing period, free of foundation.
Safety
steel structure, windproof, shockproof.
Durability
steel plate outer wall, corrosion resistance, acid resistance, no rust and cracking, the service life of more than 20 years.
Sound insulation and heat insulation
air break heat design, sound insulation and heat insulation is good.
Aesthetic
can do a variety of modeling design, the outer wall color, bright appearance, beautiful.
The service life of the container house is about 30 years, and the length of its service life is determined by the quality of the material itself and the later maintenance.
First: the main materials of the container house are wall panels and frames, upper and lower beams and connectors. The thickness and anti-corrosion treatment of the above materials determine the most fundamental use time of the house. Zhongtai Housing imported an automatic spraying assembly line to colorize the metal surface of the container house with a graphene electrostatic spraying process to ensure that the paint surface will not change color for 30 years. The main structure of the Zhongtai container house has a reasonable design, stable materials and structural mechanics, solid materials, and excellent wind resistance and earthquake resistance.
Second: the container house should be built in a clean and tidy environment. Even in a high-salt and highly corrosive environment, attention should be paid to basic protection. The ground of the site should be flat, not low-lying, and have sufficient load-bearing capacity. It is better to support it with bricks on the ground or get a layer of cement concrete as a bedding. It is best to keep the indoor dry and ventilated frequently, so that it will be more comfortable to live in, and it will also prevent the water from the ground from intruding into the floor, which will cause certain damage over time. In addition, take precautionary measures to avoid lightning in some lightning areas.
Third: pay attention to the uniform force on all parts of the room. Before the container house is built, it is necessary to understand the structure of each part of the container house to prevent brittle cracks easily after being squeezed by external forces during installation, resulting in overall damage or safety problems.
Fourth: do a good job in post-maintenance. Since the container house is installed in the urban construction site or far away from the suburbs of the city, the surrounding environment is not very friendly to the use of the house, and because the paint of the container house is an environmentally friendly and durable material, it is exposed to sunlight for a long time. The primer of the container house will still fall off under the influence of sun exposure and high and low temperature. Therefore, in daily life, we must pay attention to the maintenance and paint filling of the vulnerable parts of the container house at regular intervals to prolong the service life.
It is difficult for me to give you the house price, for China prefab/modular house, for the bunk house container is a complex project, you should tell us the house purpose, Please tell me what you need the house for, whether it is a permanent building or a temporary one. You only need the house body (house structure, wall panel, roof panel, water supply/draining system, electric system, toilet equipment, etc.), the home container price is different according to different requirements, we, one of the most professional steel frame house suppliers, have only done container houses and temporary buildings in your country, you can visit our company website to check our products. You only need to tell us which product type you are interested in and whether you have a sketch. This will save us time for communication. As a mature container house construction company, we hope to get your reply so that we can give you a preliminary design and quotation.
We will provide installation instruction and video for you; technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.
If you have drawing, we can offer you our quotation according to your drawing. If you have no design, our engineer will design some drawings for you to confirm. And then offer you a quotation.
Monthly Production: container house 200sets per day.
Usually it is within 2-30 days, definitely according to quantity and color.
Strict product quality control, quality makes the future. This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before delivery.